Hello,
In order to simplify maintenance between JIRA and story map on Miro it could be interesting to consider two things :
- To give the possibility to link steps with epics, by doing that it means if I make change in JIRA or in Miro then my items will be in the right epics/steps.
- To give the possibility to link Activities and Feature for the same reason.
All these to keep a good overview (the same one) between JIRA and the story map in Miro. Today itβs a manual operation and it tooks an incredible amount of discipline and time to the scrum team. And it often lead to errors.