Does the WBS auto generate the item numbers? Is there add it so that if I make changes down the road I don’t have to re-number every item manually?
For example:
1.1
1.1.1
etc.
Does the WBS auto generate the item numbers? Is there add it so that if I make changes down the road I don’t have to re-number every item manually?
For example:
1.1
1.1.1
etc.
For example - are you referring to
Hi
However it can be found here - https://miro.com/templates/work-breakdown-structure/
I originally found it through a Google search. But I am wondering if there is a more automated way to populate it. If the only way to use this template is to manually add boxes and connecting lines and to manually number the items, it’s very time consuming.
I’m hoping there’s a better way that I’m unaware of.
Thx!
Given that it is just a bunch of cards connected by arrows, no, there is no additional behavior associated with the template. Adding levels or populating with with WBS IDs would need to be done manually.
Kiron
I have similar question, is there an option to change the multi-level numbered list to legal type numbering (e.g. 1., 1.2, 1.2.3.)?
No - it appears to be hardcoded to switch from number (1,2,3) to letters (a,b,c) when you indent an outline level. I’d suggest reviewing the wish list guidelines here and feel free to add a wish list idea. If you do so, please remember to upvote it for yourself: Wish List: Everything You Need to Know 🌠 | Miro
Kiron
Enter your username or e-mail address. We'll send you an e-mail with instructions to reset your password.