I have added the Story Points field to our Jira tickets (and actually hidden the Remaining/Original estimates fields).
However, even after doing this, the Miro Estimation is setting the Remaining and Original estimate fields in minutes (see History log), instead of using the Story Points field.
Note: The Story Points widget correctly sets the story points (see the extra History log).
Â